Technical assistance to the Project Manager for the technical studies of Nador West Med port structures

Technical assistance to the Project Manager for the technical studies of Nador West Med port structures


Project Description
  • 26 June 2018
Mission description

Assistance to the Project Manager and monitoring of technical studies for:

Establishment of the master plan of the port and preliminary draft

Detailed preliminary study

Preparation of tender document package

Project description

The project is broken down as follows:

  • A main embankment breakwater, with developed length of about 4.5 km
  • A secondary embankment breakwater, with developed length of about 1.5 km
  • Two container terminals of about 1,600 m with a depth of up to 18 m
  • 2 terminals up to -20 m/zh dedicated to raw products
  • 2 terminals up to -16.50 m/zh dedicated to refined products
  • A terminal of 320 ml at -16.5 m dedicated to coal vessels.
  • A dock of about 300 ml with depth of 16.00 m for bulk and miscellaneous vessels

In-fill surfaces a part of which is reclaimed from the sea.