Oil terminal N°2 at the Port of Tangier Med 1

Oil terminal N°2 at the Port of Tangier Med 1


Project Description
  • 9 June 2018
Mission description

Provision of detailed execution studies:

  • Assumptions note
  • Dock wall stability calculation note
  • Dock wall verification calculation note
  • Settlement calculation note
  • Anti-scour mat calculation note
  • Slabbing calculation note and execution drawings
  • Cap beam calculation note and execution drawings
  • Calculation note for 2×150 T hook anchoring blocks to be secured to the caissons
Project description

The 70 ml dock leveled with the +4.00 zh dimension is based on the -17.80 zh dimension