Oil terminal N°2 at the Port of Tangier Med 1 tectoneuser-12018-10-01T03:04:39+02:00 Project Description 9 June 2018 Mission description Provision of detailed execution studies: Assumptions note Dock wall stability calculation note Dock wall verification calculation note Settlement calculation note Anti-scour mat calculation note Slabbing calculation note and execution drawings Cap beam calculation note and execution drawings Calculation note for 2×150 T hook anchoring blocks to be secured to the caissons Project description The 70 ml dock leveled with the +4.00 zh dimension is based on the -17.80 zh dimension