Extension of dock T5 of the Port of Tangier City

Extension of dock T5 of the Port of Tangier City


Project Description
  • 9 June 2018
Mission description

Execution studies, handling design, methodology and technical assistance

Supply of formwork and reinforcement drawings

Upgrading of drawings for dock and return walls, cap beam and its prefab components

Supply of calculation notes for solid steel reinforcement and cap beam

Supply of formwork drawings for blocks

Supply of formwork drawings and handling methodology for components in the design of cap beam.

Supply of the study of docking energies and the mooring forces on the structure.

Revolution Slider Error: Slider with alias av-13-451-120-extension-du-quai-t5-du-port-de-tanger-ville not found.
Maybe you mean: 'demo-construction' or 'demo-construction1' or '00-213-centre-detudes-nucleaires-de-la-maamoura-cnesten' or '00-230-entrepots-et-ateliers-societe-dma-importateur-michelin' or '00-235-wharf-de-laayoune' or '02-270-01-projet-dextension-du-port-de-laayoune'
Project description
  • Extension of dock made by prefabricated elements following the patented STABLOC processThe project breaks down as follows:
    • Dock of 150 ml founded at -12.00 m/ZH and cap at +4.50 m/ZH
    • Return dock of 28 ml
    • Cap beam and solid 50 T bollard