Extension of the dock of the Military Port of Ksar Sghir

Extension of the dock of the Military Port of Ksar Sghir


Project Description
  • 9 June 2018
Mission description

Studies, execution drawings and methodology.

Dock stability study

Supply of formwork drawings for dock blocks

Supply of formwork drawings and handling methodology for components in the design of cap beam.

Supply of the study of docking energy and the mooring forces on the structure.

Supply of formwork and stability calculation of the dock blocks.

Supply of execution drawings for the cap beam including prefabricated components (screen, trestle, etc.).

Submission of as-built drawings.

Projet description

Deck with length 220 ml founded at -10.20 m/zh dock height 15.30 m and caps +4.00 mzh. (TECTONE STABLOC patented system)