  • 10 June 2018
Mission description

Conducting detailed technical studies for beginning construction work on the energy harbor.

  • Analysis of existing studies and adaptation of the project’s master plan.
  • Detailed preliminary study
  • Digital modeling.
  • Preparation of contractor tender files.
  • Studies on reduced scale physical models.
  • Assistance with reviewing technical bids.
Projet description

2 Crude terminals founded at -20.00 mZh for ships 70,000 to 170,000 DWT, each terminal consisting of:

  • 8 caissons for berthing and mooring vessels.
  • 1 caisson for the 15.10 m x 24.80 m platform.
  • 1 Bridge mixed steel/concrete.
  • 8 gangways for pilot.

1 “Refined” Oil terminal consisting of four stations.

  • 2 terminals founded at -18.75 mZh for ships 30,000 to 120,000 DWT.
  • 2 terminals founded at -17.25 mZh for ships 15,000 to 150,000 DWT.

Each station consisting of:

  • 1 caisson for the 15.10 m x 24.80 m platform.
  • 2 caissons for berthing and mooring vessels.
  • 1 isostatic span bridge with 31.85 m span.
  • Caissons for supporting bridges and mooring vessels.
  • 12 pilot gangways.

1 Gas terminal founded at -14.75 mZh, for vessels of 70,000 to 268.000 m3

Station consists of:

  • 1 caisson for platform with 15.10m x 24.80 m dimensions.
  • 10 hot-dip galvanized metal gangways.
  • 10 caissons for berthing and mooring vessels.
  • 1 mixed steel concrete bridge providing access to the platform and support for pipes
  • 3 caissons for supporting isostatic spans of the bridge.

2 Terminals

  • 1 miscellaneous Terminal

640.50 ml of dock founded at -14.00 mZh for ships 40,000 to 60,000 DWT.

1 Specialized bulk terminal