New port at Ksar Sghir

New port at Ksar Sghir


Project Description
  • 10 June 2018
Mission description

Stability and execution dimensioning studies for dock walls, work methodology and technical assistance

Projet description

Dock of 208 ml founded at -10 m/ZH and cap at +4.00 m/ZH

205 ml protective connector.

1.7 Ha of in-fill surface.