Rehabilitation of sheet pile dock pier V (section 2 mdimia) at the Port of Dakar

Rehabilitation of sheet pile dock pier V (section 2 mdimia) at the Port of Dakar


Project Description
  • 10 June 2018
Mission Description
  • Execution studies and drawings
  • Supply of drawings for fabrication of molds/forms
  • Technical assistance and work methodology
  • Stability study of the sheet pile curtain at the dock
  • Study of the prefabricated capping beam.
  • Study of the apron return with former curtain preserved partly as lost formwork
Projet Description
  • Dock length 200 m
  • Total height 13.50 m
  • Seat level -11.50 m/zh
  • Capping +3.00 mzh