Rehabilitation of the Laâyoune Wharf

Rehabilitation of the Laâyoune Wharf


Project Description
  • 10 June 2018
Mission Description

Design, studies, execution drawings and work methodology

Projet Description

Length of the Wharf: 1,800 ml

Design of a tool carrier of 126 m and 300 T for support and removal of the 45 m span concrete beam

  • Rehabilitation of 120 piles,
  • Removal and replacement of 17 prestressed spans of the access bridge (45 m span),
  • Design of a self-supporting tool with hydraulic assist for removal of beams (length: 126 m, weight: 300 T),
  • Replacement of beams by metal caissons