Development of the East Container Terminal basin at the Port of Casablanca

Development of the East Container Terminal basin at the Port of Casablanca


Project Description
  • 10 June 2018
Mission Description

Studies, design, tender document package, and tender drawings

Projet Description

CID / TECTONE / SOGREAH GROUP.

Docks with caissons length 220 ml at -12.75 m/zh + 28 ml return

Prefabricated caisson.

  • Prefabricated front links and screens.
  • 468 ml of cap beam.
  • 500 ml of rear sill
  • 6.5 ha of in-fill surface.
  • Terminal equipment with 40 T gantry cranes