Reinforcement of the breakwater and guard wall at the Port of Sidi Ifni tectoneuser-12018-10-01T01:51:00+02:00 Project Description 11 June 2018 Mission Description Studies, execution drawings and work methodology Projet Description Reinforcement of main breakwater over 730 ml + pierhead. Reinforcement of secondary breakwater over 760 ml + pierheads. 200 m of docking blocks seated at -5.00 mzh and capped at +5.00 mzh Floating pier 96 ml. Inclined plane 50 × 30 m