Extension of port facilities at the Port of TAN TAN

Extension of port facilities at the Port of TAN TAN


Project Description
  • 11 June 2018
Mission Description

Studies, execution drawings and work methodology

 

 

 

 

 

 

 

 

 

 

 

 

Projet Description
  • 422 ml of dock at -6.5 m/zh
  • 50 ml of dock at -4.00 m/zh
  • 350 ml of piles for gantry crane founded at -3.5 mzh of 37 x 10 m.
  • 750 m of sand breakwater