Construction of the drinking water system between Bata and Mbini and connection of the city of Mbini

Construction of the drinking water system between Bata and Mbini and connection of the city of Mbini


Project Description
  • 11 June 2018
Mission Description

Inspection study and execution drawingsSite work inspectionStudies and work technical assistance
Financial supervision
Preparation of monthly reports and technical monitoring
Control and validation of payment situations
Scheduling of payments

Projet Description

Control of the following projects:

  • Pumping unit for treated water in Bata
  • Installation of treated water supply network in PVC DN 225 (PN 16) and PVC DN 315 (PN 10)
  • Installation of DN 300 pipes at river crossings
  • Construction of 300 m³ capacity tank
  • Construction of the break chambers
  • Construction of river crossing structures along the road
  • Construction of 25 fountains along the route