Bata/Niefang Route – Extension, pavement improvement and bridge construction

Bata/Niefang Route – Extension, pavement improvement and bridge construction


Project Description
  • 11 June 2018
Mission Description
  • Inspection study and execution drawingsSite work inspection
  • Studies and work technical assistance
  • Financial supervision
  • Preparation of monthly reports and technical monitoring
  • Control and validation of payment situations
  • Scheduling of payments
Projet Description
  • Paved road 7.00 m wide
  • “V” side ditches 1.20 m deep.
  • Width of foundation layer: 12.75 m
  • Control of the following projects:
  • A 625 m long viaduct with a maximum height of 27 m