Corisco Airport, Passenger terminal, technical block, presidential pavilion and control tower

Corisco Airport, Passenger terminal, technical block, presidential pavilion and control tower


Project Description
  • 11 June 2018
Mission Description
  • Inspection study and execution drawings.Site work inspection.
  • Studies and work technical assistance.
  • Financial supervision.
  • Preparation of monthly reports and technical monitoring.
  • Control and validation of payment situations.
  • Scheduling of payments.
Projet Description
  • Control of the following projects:
  • Construction of a 4,100 m² air terminal covered by a laminated/glued wood roof.
  • Interior furniture and baggage transport equipment.
  • Water, electricity and air conditioning networks.
  • Airport surveillance and control documentation.
  • Control tower in reinforced concrete.
  • 1,500 m² covered technical block.
  • 500 m² covered presidential pavilion