Drinking, sanitation water supply for the city of Bata tectoneuser-12018-10-01T16:47:48+02:00 Project Description 11 June 2018 Mission Description Inspection study and execution drawings.Site work inspection. Studies and work technical assistance. Financial supervision. Preparation of monthly reports and technical monitoring. Control and validation of payment situations. Scheduling of payments. Projet Description Control of the following projects: Sendje water intake and pumping station. Supply of raw water between Sendje and the KM 6 sewage treatment plant on the Bata-Sendje motorway. PK 6 treatment plant. Drinking water tank n° 1.H19 Bata urban drinking water network. Bata urban wastewater sanitation network. Installation of the network by gravity. Bata wastewater treatment plant.