Terminal and maritime promenade for Port Kogo (Additional to initial project)

Terminal and maritime promenade for Port Kogo (Additional to initial project)


Project Description
  • 11 June 2018
Mission Description
  • Inspection study and execution drawings.Site work inspection.
  • Studies and work technical assistance.
  • Financial supervision.
  • Preparation of monthly reports and technical monitoring.
  • Control and validation of payment situations.
  • Scheduling of payments.
Projet Description
  • Control of the following projects:
    • A maritime promenade of about 970 ml.
    • Backfill reclaiming the river of 10.8 hectares of which about 3.2 ha will be dedicated to the port and 7.6 ha to the Maritime Promenade and urban planning.
    • A port terminal with a jetty 360 ml long at -5.00 m depth, with a dock embankment of 6300 m² and rear backfill of 4 hectares.

    A mixed bridge which includes two metal bridges on piles 150 ml in total and a 645 ml access jetty