Strengthening the drinking water supply infrastructure of the city of Bata

Strengthening the drinking water supply infrastructure of the city of Bata


Project Description
  • 11 June 2018
Mission Description

Inspection study and execution drawingsSite work inspection
Studies and work technical assistance
Financial supervision
Preparation of monthly reports and technical monitoring
Control and validation of payment situations
Scheduling of payments

Projet Description
  • Control of the following projects:
    • Construction of a 1500 m³ water tower with a 15 m high tower
    • Construction of a pumping station to supply the tank
    • Construction of a second tank with a capacity of 4500 m³