Connection of the drinking water supply network to houses of the city of Bata – Section 1

Connection of the drinking water supply network to houses of the city of Bata – Section 1


Project Description
  • 11 June 2018
Mission Description
  • Inspection study and execution drawings
  • Site work inspection
  • Studies and work technical assistance
  • Financial supervision
  • Preparation of monthly reports and technical monitoring
  • Control and validation of payment situations
  • Scheduling of payments
Projet Description
    • Installation of 25 km of PE Ø tubes between DN 50 and DN 90
    • Installation of 1,850 individual small sized connections (DN 20, DN 32 and DN 50)
    • Installation of 50 large size individual connections (DN 60 with propeller meters)
    • Control of the following projects:
    • Installation of 100 collective connections from 6 to 18 meters per connection