Supply of drinking water for the population between Bata and Senje from Km 6 tectoneuser-12018-10-01T17:02:55+02:00 Project Description 11 June 2018 Mission Description Inspection study and execution drawingsSite work inspection Studies and work technical assistance Financial supervision Preparation of monthly reports and technical monitoring Control and validation of payment situations Scheduling of payments Projet Description Control of the following projects: Setting up on 34 Km of a DN200 (PN 10) PE pipe with online equipment Construction of a treated water pressure stations at Bata with equipment Construction of water course crossing structures Construction of delivery tanks, 10 tanks of 5 m³ and 5 tanks of 10 m³