Construction of an air terminal with a surface area of 2,000 m² on the ground and a 4,000 m2 roof
Interior furniture and baggage transport equipment
Service vehicles
Water, electricity and air conditioning networks
Airport surveillance and control documentation
Control tower in reinforced concrete.
Technical block
Revolution Slider Error: Slider with alias guinee-parking-avions-bloc-technique-et-tour-de-controle-de-laeroport-dannobon not found. Maybe you mean: 'demo-construction' or 'demo-construction1' or '00-213-centre-detudes-nucleaires-de-la-maamoura-cnesten' or '00-230-entrepots-et-ateliers-societe-dma-importateur-michelin' or '00-235-wharf-de-laayoune' or '02-270-01-projet-dextension-du-port-de-laayoune'
Projet Description
Inspection study and execution drawings
Site work inspection
Studies and work technical assistance
Financial supervision
Preparation of monthly reports and technical monitoring