Reinforcement of stations 30 to 34 of the Commercial Pier of the Port of Casablanca

Reinforcement of stations 30 to 34 of the Commercial Pier of the Port of Casablanca


Project Description
  • 10 June 2018
Description de la mission

Studies, execution drawings and technical assistance

Description projet

Rehabilitation of 823 ml of dock, released in sections of 100 ml due to exploitation

  • Nature of work:
  • Total demolition of the capping beam
  • Preparation and installation of prefabricated siding (TECTONE CLAVEBLOC patented).
  • Special concrete and galvanized rebar.
  • Reconstitution of the capping beam.

Total retrofitting of docks, including replacement of crane lanes from 6 and 10 T to 38 T.