Corisco Airport, Passenger terminal, technical block, presidential pavilion and control tower tectoneuser-12018-10-01T16:50:34+02:00 Project Description 11 June 2018 Mission Description Inspection study and execution drawings.Site work inspection. Studies and work technical assistance. Financial supervision. Preparation of monthly reports and technical monitoring. Control and validation of payment situations. Scheduling of payments. Projet Description Control of the following projects: Construction of a 4,100 m² air terminal covered by a laminated/glued wood roof. Interior furniture and baggage transport equipment. Water, electricity and air conditioning networks. Airport surveillance and control documentation. Control tower in reinforced concrete. 1,500 m² covered technical block. 500 m² covered presidential pavilion