Master plan of the new naval repair area of the Port of Casablanca

Master plan of the new naval repair area of the Port of Casablanca


Project Description
  • 10 June 2018
Mission Description

Studies conducted by TECTONE / CID group:

  • Situation expert assessment.
  • Design and studies of development variant.
  • Preparation of preliminary draft.
  • Estimation and simulation of investment costs.
Projet Description

Project variants for:

  • 300 T Belt Lift
  • 5,000T or 10,000 T boat lift
  • Arming Wharf 220 x 2 m.
  • Line of garages
    • Width of 16 m, 3 x 200 m.
    • Width of 20 m, 2 x 200 m.
    • Width of 25 m, 200 m.
    • Width of 30 m, 200 m.

Repair area > at 44,000 m². Area of workshops: 18,500 m²