Reinforcement of stations 34 to 36 and return of apron T4 of the Commercial Pier of the Port of Casablanca

Reinforcement of stations 34 to 36 and return of apron T4 of the Commercial Pier of the Port of Casablanca


Project Description
  • 10 June 2018
Mission Description

Studies, execution drawings and technical assistance

Projet Description

Rehabilitation of 423 ml of dock founded between -10.00 and -12.00 m/zh, released in sections of 100 ml due to exploitation

Work deadlines for each section: 45 days

  • Total demolition of the capping beam.
  • Preparation and installation of a prefabricated siding TECTONE CLAVEBLOC patented system.
  • Special concrete and galvanized rebar.
  • Reconstitution of the capping beam.

Total retrofitting of docks, including replacement of crane lanes from 6 and 10 T to 38 T.