Total rehabilitation of Pier 2 of the Autonomous Port of Dakar

Total rehabilitation of Pier 2 of the Autonomous Port of Dakar


Project Description
  • 11 June 2018
Mission Description

Execution studies and drawings

Supply of drawings for fabrication of molds/forms

Technical assistance and work methodology.

Projet Description

Use of the patented TECTONE CLAVEBLOC process:

  • 336 ml of dock in blocks set from -10.00 to +2.50 m/Zh,
  • 310 ml of dock in caissons set from -8.50 to +2.50 m/Zh.

22,830 m² of in-fill surface.