Extension of the Container Terminal (3rd berth) at the Autonomous Port of Dakar

Extension of the Container Terminal (3rd berth) at the Autonomous Port of Dakar


Project Description
  • 10 June 2018
Mission Description

Execution studies and drawings

Supply of drawings for fabrication of molds/forms

Technical assistance and work methodology

Projet Description

Total rehabilitation of the East Dock of Pier II dating from the 1900s

  • Length 350 m and 375 m,
  • Total height 12.40 m
  • Seat level -8.40 m/zh
  • 293 ml of dock in hollow blocks from -13.00 to +2.50 m/Zh
  • 660,000 m³ of dredging.
  • 80,000 m³ of de-silting.
  • 815,000 m³ of hydraulic backfill.