New promenade and its access and redevelopment of the existing waterfront of the city of Agadir tectoneuser-12018-10-01T02:34:58+02:00 Project Description 10 June 2018 Mission Description Study and preparation of work execution drawings Tender document package by lot Monitoring of work execution Projet Description From the 4,000 ml seawall, From the promenade medium width arrangement 25 ml, From 5 accesses of medium length 300 m, MV-LV Network – Sanitary – Fire – IrrigationOverall contract processed in 4 sections:For all sections Studies: Hydraulic works for storm water discharges