Studies for transfer from the RO RO A1 station of the TARIK pier to stations 50 at the Port of Casablanca

Studies for transfer from the RO RO A1 station of the TARIK pier to stations 50 at the Port of Casablanca


Project Description
  • 10 June 2018
Mission Description

Studies for design and construction methodology (prefab, formwork, etc.).Civil Engineering study of new supports and rehabilitation of the gangway.Coordination of the work.

Projet Description

Moving a metal RO-RO bridge 30 m long.

Cylinder support piles made in caisson by prefabricated elements with the patented CLAVEBLOC process.