Reinforcement of the breakwater and guard wall at the Port of Sidi Ifni

Reinforcement of the breakwater and guard wall at the Port of Sidi Ifni


Project Description
  • 11 June 2018
Mission Description

Studies, execution drawings and work methodology

Projet Description
  • Reinforcement of main breakwater over 730 ml + pierhead.
  • Reinforcement of secondary breakwater over 760 ml + pierheads.
  • 200 m of docking blocks seated at -5.00 mzh and capped at +5.00 mzh
  • Floating pier 96 ml.
  • Inclined plane 50 × 30 m