Construction of a new car ferry station at Nador

Construction of a new car ferry station at Nador


Project Description
  • 11 June 2018
Mission Description

Studies, execution drawings and work methodology

Projet Description

The study consists of:

  • Demolition of the closing wall enclosing the current in-fill surface of the future ferry terminal.
  • Construction over a length of 84 m of an unloading dock of -7.00 to +1.80 hydro and access ramps in the extension of the existing dock coping beam.
  • Construction over a length of 168 m of a berthing dock from -7.00 to +2.50 perpendicular to the preceding one.
  • Construction, along the berthing dock, of the unloading dock and future ferry terminal, of an in-fill surface of about 1.45 ha.
  • Installation of protective shells for the in-fill surface.
  • Construction of pavement and body of the roadway over about 0.80 ha.
  • Electrical and water equipment.
  • Fender equipment and bollards of the new dock and replacement of existing dock fenders.