Extension of the Annobon airport runway tectoneuser-12018-10-01T16:49:49+02:00 Project Description 11 June 2018 Mission Description Inspection study and execution drawings.Site work inspection.Studies and work technical assistance.Financial supervision. Preparation of monthly reports and technical monitoring. Control and validation of payment situations. Scheduling of payments. Projet Description Control of the following projects: General infill in sterile quarry 0/200 mm Compacted in-fill surface for a form layer Protection breakwater over a length of 477 ml. Extension of the runway by 610 ml. Reconstruction of the concrete road over a length of 400 ml. Sanitation of the river and rainwater.