Extension of the Annobon airport runway

Extension of the Annobon airport runway


Project Description
  • 11 June 2018
Mission Description
  • Inspection study and execution drawings.Site work inspection.Studies and work technical assistance.Financial supervision.
  • Preparation of monthly reports and technical monitoring.
  • Control and validation of payment situations.
  • Scheduling of payments.
Projet Description

Control of the following projects:

  • General infill in sterile quarry 0/200 mm
  • Compacted in-fill surface for a form layer
  • Protection breakwater over a length of 477 ml.
  • Extension of the runway by 610 ml.
  • Reconstruction of the concrete road over a length of 400 ml.
  • Sanitation of the river and rainwater.