Control of the following projects:
Port of Annobon:
- 1,183 ml of transversal breakwater.
- 480 ml protective connector.
- Dock of 150 ml at 7.00 m/zh
- 25 ml RO-RO terminal.
- 120 ml hydrocarbon dock.
- 144 ml of floating dock.
- In-fill surface of 5.5 hectares.
- 110,000 m3 of dredging.
- Various networks
- Extension of the sea front protection over 280 ml.
- Protection by breakwater 121,000 m³.
- Rigid pavement, 68,400 m³.
- Slope protection 28,400 m³.
Port of Kogo:
- 2 bridges 75 x 5 ml on piles Ø 710 mm
- 2 extensions 24 m long and 10 m wide for vehicle crossing.
- 1 access jetty of 645 ml.
- 1 dock on piles 366 ml founded at -5.00 m.
- 199,960 m3 of dredging.