New ports of Kogo and Annobon

New ports of Kogo and Annobon


Project Description
  • 27 June 2018
Mission Description

Inspection study and execution drawings

Site work inspection

Studies and work technical assistance

Financial supervision

Preparation of monthly reports and technical monitoring

Control and validation of payment situations

Scheduling of payments

Projet Description

Control of the following projects:

Port of Annobon:

  • 1,183 ml of transversal breakwater.
  • 480 ml protective connector.
  • Dock of 150 ml at 7.00 m/zh
  • 25 ml RO-RO terminal.
  • 120 ml hydrocarbon dock.
  • 144 ml of floating dock.
  • In-fill surface of 5.5 hectares.
  • 110,000 m3 of dredging.
  • Various networks
  • Extension of the sea front protection over 280 ml.
  • Protection by breakwater 121,000 m³.
  • Rigid pavement, 68,400 m³.
  • Slope protection 28,400 m³.

 

Port of Kogo:

  • 2 bridges 75 x 5 ml on piles Ø 710 mm
  • 2 extensions 24 m long and 10 m wide for vehicle crossing.
  • 1 access jetty of 645 ml.
  • 1 dock on piles 366 ml founded at -5.00 m.

199,960 m3 of dredging.