Bata/Niefang Route – Extension, pavement improvement and bridge construction tectoneuser-12018-10-01T17:02:19+02:00 Project Description 11 June 2018 Mission Description Inspection study and execution drawingsSite work inspection Studies and work technical assistance Financial supervision Preparation of monthly reports and technical monitoring Control and validation of payment situations Scheduling of payments Projet Description Paved road 7.00 m wide “V” side ditches 1.20 m deep. Width of foundation layer: 12.75 m Control of the following projects: A 625 m long viaduct with a maximum height of 27 m