Pedestrian gallery and tracks for mobile gangways at stations T1, T2 and T3 at the Port of Tangier

Pedestrian gallery and tracks for mobile gangways at stations T1, T2 and T3 at the Port of Tangier


Project Description
  • 10 June 2018
Mission Description

Design, studies and execution drawings, work methodology and monitoring of work

Projet Description
  • Extension of the decking by prefabricated concrete apron laid on piles in patented CLAVEBLOC system elements of 10.00 m x 6.00 m x 1.60 m superimposed and keyed.
    • Height 11.50
    • Seating level -7.50 m/zh

    Replacement of 60 T cylinder support piles with new piles for 200 T cylinders in special elements of patented TECTONE CLAVEBLOC design