ERAMM PRESENTATION
Environmental and Coastal Consulting
In 2016, TECTONE GROUP acquired the ERAMM firm which was founded in 1989 by Pierre Farnole, Doctor in Oceanology, who has led management since then..
Read more
DIGITAL TOOLS
AUTOCAD/COVADIS: cubature calculations, 3d views
CMS WAVE
CMS FLOW
Technical Assistance to Project Management for Development and Upgrading of the Waterfront
at Saint Denis de La Réunion: “Maritime Component”:
– Assistance with production of Design Construction tender documents and with selection of contractors
– Writing specifications :
– Bathymetry, geotechnics, wave tank tests
– Monitoring of 3D model tests at Sogreah (Grenoble)
Urbanization of the Monaco waterfront - impact of the project on the environment:
Marine Environment Component
Offshore urbanization project over 25 ha in coastal area at great depth: Cost € 10 Billion
– Conducting biocenotic survey
– Survey of sediment and sediment quality
– Conducting study of environment and impact on the marine environment: definition of protective and compensatory measures :
– Setting up artificial reefs
– Bubble screen to form a screen in the construction phase and to preserve water quality
MAIN REFERENCES
Year | Customer / Location | Services |
---|---|---|
In progress | City of Barcarès | Technical assistance to public entity in the context of a public works concession grant |
In progress | PHOSBOUCRAA BET TECTONE | Assistance mission for approval of technical studies for construction of the New Port of LAAYOUNE |
2014 | Grand Seaport of Dunkirk | 2014-2018 Strategic project: Environmental assessment lot 1: oceanographic expertise |
2013 | City of Saint Gilles Croix de Vie | Prime contractor for extension of the Port la Vie marina at Saint Gilles Croix de Vie |
2012 | Municipality of Noirmoutier-en-l’Ile | Prime contractor for the work of reconstruction of the Bois de la Chaize boom |
2012 | Saint Jean Cap Ferrat Town Hall | Project management for repair of the Passable Beach dock |
2011-12 | Bastia Chamber of Commerce - ILE ROUSSE | Assistance to Project Management for performance of administrative procedures required for execution of maritime works as part of the Ile Rousse commercial port development plan: - Marine environment studies - Geotechnical survey - 3d bathymetric survey |
2011-12 | Nice Commercial Court/City of Cannes/SOGREAH | Protection of La Croisette beaches - Work to set up an underwater geotextile breakwater: - Wave study - Geotubes position survey - In-situ measurement analysis report - Stability study of geotextile rolls - Example of application of geotubes in the Mediterranean |
2011 | General Council of Vendée | Prime contractor mission for reconstruction of the La Tranche sur mer pier - study of hydrodynamic forces on the structure |
2011 | Kingdom of MOROCCO Ports and Maritime Public Domain Directorate | Mission of assessment of the study for extension of the Port of Tarfaya: - Assistance with monitoring of agitation model studies - Assistance with monitoring of current model studies - Assistance with monitoring of sedimentology model studies |
2010-2014 | Association of Pampelonne Beach Operators (AEPP-Var.) | Pampelonne Beach Layout Plan: Assistance on the hydraulic and sedimentological aspects in relation to the risk of erosion and marine submersion |
2010 | MERCERON Group La Louippe Jobsite | Sea defense work between the Port des Champs and the Port de la Louippe: Assessment on work in progress |
2010 | Town hall of Saint-Jean-Cap-Ferrat | Prime contractor mission for construction of a protection structure for the Passable Beach and proposals for development of access to the beach: - Water Law file, Impact study, Tender document package |
2012 | ASP Port Grimaud I ASL Port Grimaud II SNPG | Dragage de la passe d’accès à Port Grimaud 1 et de l’embouchure de la Giscle : - Dossier de déclaration au titre de la loi sur l’eau - Dossier Natura 2000 |
2011 | ASL Port Grimaud II ASL of the neighbors along the Giscle and the Gisclette | Emergency and regulatory files for dredging the Giscle |
2012 | IC.tp | Construction of an SNCF retaining wall at Eze: - Wave and predimensioning study |
2012 | Mixed Syndicate of Les Marais des Olonnes | Hydrosedimentary study with 2D modeling - Gachère Dam: - Phase 1: Site condition report - Phase 2: Additional on-site measurements (bathy, current and sediment) - Phase 3: 2D hydrosedimentary modeling - Phase 4: Preliminary draft for rehabilitation of the dam and combating the risk of marine submersion |
2012 | General Council of Vendée | Prime contractor mission for reconstruction of the La Tranche sur mer pier - study of hydrodynamic forces |
2011-12 | Coastal conservation (Bastia) | Preliminary study of the hydraulic structure on the Urbino Pond: redevelopment of the Grau - Phase 1: diagnosis (surveys of bathymetry, sediment, fauna and flora, currents… Modeling of the wave currents and sediment transport) - Phase 2: protection and redevelopment scenarios for Grau: 2D hydrosedimentary modeling study |
2011 | General Council of Vendée | Prime contractor mission for reconstruction of the La Tranche sur mer pier - study of hydrodynamic forces on the structure |
2010 | Town hall of Saint-Jean-Cap-Ferrat | Prime contractor mission for construction of a protection structure for the Passable Beach and proposals for development of access to the beach: - Water Law file - Impact study - Tender document package |
2014 | Mixed Syndicate of Ports of Toulon | Project of construction of a cruise pier: Lot 2 currents and turbulence |
2013 | Insulaire Engineering Office | Study of turbulence on the site of the organized anchorage project at Cala d’Oro |
2013 | STARESO | Impact study mission, hydrosedimentary impact at the Port of Ile Rousse: - Addendum N°1 to the impact study, Impact on the hydrosedimentary component |
2012 | Municipality of Propriano | Calculation and modeling of wave stresses prior to predimensioning of the SERRA breakwater on the port of the Municipality of Propriano |
2012 | Cala di Purcili Nautical Association | Wave study for organized moorings on 2 sites |
2012 | Municipality of Serra di Ferro | Gulf of Porto Pollo: Reorganization of organized moorings - Declaration file under the Water Law |
2012 | Municipality of Serra di Ferro | Restructuring of the Porto Pollo marina: further study of turbulence and crossing study |
2012 | Municipality of Brando | Port of Erbalunga - Wave propagation model: predimensioning |
2012 | Municipality of Luri | Port of Santa Severa - Wave propagation model: predimensioning |
2012 | Municipality of Théoule | Diagnosis of the dike off the Port of Figueirette: wave propagation study and predimensioning of the breakwater |
2011 2012 | General Council of Alpes Maritimes | Departmental port of Villefranche-Santé: Maintenance dredging of the harbor basin |
2011 | Town hall of Camaret | Studies required for protection of the water body of the Port of Camaret-sur-mer |
2011 | Brittany Region | Expert assessment of the hydro sedimentary behavior of the Rohu site |
2011 | Nice French Riviera Cros de Cagnes | Diagnostic study of the environmental situation of the Port of Cros-de-Cagnes |
2010 | Luxmarina- SIFA | Conducting impact studies and establishment of the public inquiry and “Water Law” impact file for execution of the Port Argens project |
2010 | Port of La Rague | Berth 15 moorings – maneuverability study |
2010 | Municipality of Port Saint Louis du Rhône | Diagnostic study of the environmental quality of the public Port of Port-Saint-Louis-du-Rhône |
2010 | Municipality of Serra di Ferro | Étude d’impact et dossier d’instruction pour les modifications des infrastructures du Port Jean-Baptiste TOMI |
2013-14 | Kingdom of Morocco Ports and Maritime Public Domain Directorate | Hydrodynamic study of the Sebou Wadi - Sector: mouth of the Wadi - Oulad Berjal Bridge |
2013 | Kingdom of Morocco Ministry of Equipment and Transportation | Feasibility study of a fishing shelter at Aftissat Province of Boujdour |
2013 | Republic of Equatorial Guinea SOMAGEC.G.E | Port of Corisco Study of a geotube breakwater |
2013 | Republic of Equatorial Guinea SOMAGEC.G.E | Port of Cabo San-Juan Study of wave propagation and turbulence in the port basin |
2013 | National Ports Agency (Morocco) | Impact study of opening and closing of gates located below the foundation of the main breakwater of the Port of Essaouira |
2013 | Kingdom of Morocco National Ports Agency | Updating of the study of extending the docks of pier n°1 of the Port of Nador: turbulence study on mathematical model |
2012 | Kingdom of Morocco Ports and Maritime Public Domain Directorate | Sedimentological study for protection of the Bay of Agadir - Mission I: Collection of natural data of the site - Mission II: Study of sedimentary behavior of Agadir Beach - Mission III: Study of reloading the beach - Mission IV: Study of another flexible solution to the problem of erosion |
2012 | Republic of Equatorial Guinea SOMAGEC G.E | Project of the Bata military port Turbulence study: predimensioning of the breakwater and pierhead |
2011-12 | Kingdom of MOROCCO SAPT - Tangier | Sedimentological study for protection of the Bay of Tangier: - Mission 1: collection of natural data of the site - Mission 2: assessment of littoral transit and its impact on the Bay of Tangier: mathematical model - Mission3: Definition and dimensioning of beach protection structures |