Preparation of monthly reports and technical monitoring.
Control and validation of payment situations.
Scheduling of payments.
Description projet
Control of the following projects:
A maritime promenade of about 970 ml.
Backfill reclaiming the river of 10.8 hectares of which about 3.2 ha will be dedicated to the port and 7.6 ha to the Maritime Promenade and urban planning.
A port terminal with a jetty 360 ml long at -5.00 m depth, with a dock embankment of 6300 m² and rear backfill of 4 hectares.
A mixed bridge which includes two metal bridges on piles 150 ml in total and a 645 ml access jetty.